Whatsapp Resmi Dewa16 SLOT THAILAND https://dewa16.co.uk/ https://bola16.co.uk/ slo16 slot gacor http://siad.dpmd.gorutkab.go.id/ https://journal.binadarma.ac.id/pages/article/deposit-pulsa-tanpa-potongan/ https://stennisflagflyers.com/ https://nanotechinstitute.org/ slot gacor https://hollyvalance.net/ slot gacor deposit pulsa tanpa potongan slot thailand deposit pulsa tanpa potongan slot gacor hari ini slot pulsa slot pulsa https://dewa16.id/ slot gacor slot16 BOLA16 BOLA16 SLOT16 slot gacor deposit pulsa tanpa potongan https://sertifikasi.upy.ac.id/assets/mgacor/ http://103.141.105.92/ slot gacor slot gacor slot gacor slot dana slot gacor slot gacor slot thailand slot pulsa slot kamboja slot gacor https://sibangkodir.bpsdm.jatimprov.go.id/api/gacor deposit pulsa tanpa potongan slot kamboja https://littlebeedesigns.co.uk/ slot gacor maxwinhttps://siakad.stikeslakipadada.ac.id/sgacor/ https://stikeslakipadada.ac.id/gacor slot gacor slot dana deposit pulsa tanpa potongan slot thailand slot pulsa https://ppsdml.bpsdm.dephub.go.id/rames/toto/ https://kejari-sanggau.kejaksaan.go.id/ramestoto/ http://conference.fkm.unand.ac.id/rames/toto/ slot thailand togel online slot gacor slot gacor deposit pulsa tanpa potongan deposit pulsa tanpa potongan slot thailand slot gacor slot thailand deposit pulsa tanpa potongan

Analisis Dampak Lalu Lintas Akibat Galian Ipal Pada Jalan Merdeka Palembang

  • Muhammad Amrullah Ramadhan Universitas Bina Darma
  • Farlin Rosyad Universitas Bina Darma
Keywords: Waste Water Management Instalation, segment of road, Traffic Volume

Abstract

This study aims to determine how the performance of the Merdeka road segment after the IPAL.
Construction in Palembang. IPAL is a waste water management instalation that was created to
manage the disposal of waste water from Merdeka street to the Musi River. This research is
important to do to help the development of understanding of the factors that affect traffic,
especially the construction of installations from the government. The data collection process in
this study used a survey method for 12 hours per day for one week. The survey was done directly
at the construction site. The data analysis carried out includes an analysis of the performance
of the road, namely the analysis of the capacity of the road, the analysis of side barriers, the
analysis of the degree of saturation (DJ). The result of the analysis of the generation data in one
day during rush hour caused by the IPAL excavation were 26.111 vehicles/hour and 20.813,7
cur/hour. The value of the degree of saturation (DJ) obtained based on observations on the
independent road is 0,69. Therefore, it can be concluded that the IPAL construction on Merdeka
road affects the traffic volume to be higher.

Author Biographies

Muhammad Amrullah Ramadhan, Universitas Bina Darma

teknik sipil

Farlin Rosyad, Universitas Bina Darma

teknik sipil

Published
2022-12-12