Whatsapp Resmi Dewa16 SLOT THAILAND https://dewa16.co.uk/ https://bola16.co.uk/ slo16 slot gacor http://siad.dpmd.gorutkab.go.id/ https://journal.binadarma.ac.id/pages/article/deposit-pulsa-tanpa-potongan/ https://stennisflagflyers.com/ https://nanotechinstitute.org/ slot gacor https://hollyvalance.net/ slot gacor deposit pulsa tanpa potongan slot thailand deposit pulsa tanpa potongan slot gacor hari ini slot pulsa slot pulsa https://dewa16.id/ slot gacor slot16 BOLA16 BOLA16 SLOT16 slot gacor deposit pulsa tanpa potongan https://sertifikasi.upy.ac.id/assets/mgacor/ http://103.141.105.92/ slot gacor slot gacor slot gacor slot dana slot gacor slot gacor slot thailand slot pulsa slot kamboja slot gacor https://sibangkodir.bpsdm.jatimprov.go.id/api/gacor deposit pulsa tanpa potongan slot kamboja https://littlebeedesigns.co.uk/ slot gacor maxwinhttps://siakad.stikeslakipadada.ac.id/sgacor/ https://stikeslakipadada.ac.id/gacor slot gacor slot dana deposit pulsa tanpa potongan slot thailand slot pulsa https://ppsdml.bpsdm.dephub.go.id/rames/toto/ https://kejari-sanggau.kejaksaan.go.id/ramestoto/ http://conference.fkm.unand.ac.id/rames/toto/ slot thailand togel online slot gacor slot gacor deposit pulsa tanpa potongan deposit pulsa tanpa potongan slot thailand slot gacor slot thailand deposit pulsa tanpa potongan

Rancangan Prototype Switch Control dan Monitoring Lampu Landasan Berbasis Programmable Logic Control

  • Hadihanafi hadihanafi Universitas Bina Darma
  • ENDAH FITRIANI Universitas Bina Darma
Keywords: Prototype Switch Contro, PLC Outseal, Runway Lights

Abstract

Based on Law No. 1 Regarding Aviation and PM.69 of 2013 concerning the National Airport Order, completeness of aviation safety and security facilities at airports as mandatory standards. In order to optimize the performance of the Controller at Sultan Mahmud Badaruddin II International Airport in Palembang, the author made an innovation by designing and placing an automatic monitor switch for runway lights in the tower control room. This prototype consists of two devices, those are hardware and software. There are two ways to connect the Outseal PLC, that is using the Android HMI and using the Human Interface Device (control software).

Prototype Switch Control, PLC Outseal, Runway Lights

Author Biographies

Hadihanafi hadihanafi, Universitas Bina Darma

teknik Elektro

ENDAH FITRIANI, Universitas Bina Darma

teknik Elektro

Published
2021-05-24