PENJADWALAN MESIN SCREW PRESS MENGGUNAKAN METODE INDIKATOR PADA PERUSAHAAN PERKEBUNAN

Keywords: Screw press machine scheduling, indicator method

Abstract

 Scheduling is an important part of the production process before work goes down to the production floor. Poor scheduling system can prolong production completion time which in turn can reduce the quantity of production produced. In order to avoid extending the production completion time which in turn can reduce the quantity of production, one of the strategies that the company can do is scheduling and allocating resources of the screw press machine company is one of the main components in CPO (crude palm oil) extracting machines and using the indicator method .

Author Biographies

SEPTA RIYANSYAH, Universitas Bina Darma

TEKNIK INDUSTRI

Christofora Desi KUSMINDARI, Universitas Bina Darma

TEKNIK INDUSTRI

Published
2021-10-19