Whatsapp Resmi Dewa16 SLOT THAILAND https://dewa16.co.uk/ https://bola16.co.uk/ slo16 slot gacor http://siad.dpmd.gorutkab.go.id/ https://journal.binadarma.ac.id/pages/article/deposit-pulsa-tanpa-potongan/ https://stennisflagflyers.com/ https://nanotechinstitute.org/ slot gacor https://hollyvalance.net/ slot gacor deposit pulsa tanpa potongan slot thailand deposit pulsa tanpa potongan slot gacor hari ini slot pulsa slot pulsa https://dewa16.id/ slot gacor slot16 BOLA16 BOLA16 SLOT16 slot gacor deposit pulsa tanpa potongan https://sertifikasi.upy.ac.id/assets/mgacor/ http://103.141.105.92/ slot gacor slot gacor slot gacor slot dana slot gacor slot gacor slot thailand slot pulsa slot kamboja slot gacor https://sibangkodir.bpsdm.jatimprov.go.id/api/gacor deposit pulsa tanpa potongan slot kamboja https://littlebeedesigns.co.uk/ slot gacor maxwinhttps://siakad.stikeslakipadada.ac.id/sgacor/ https://stikeslakipadada.ac.id/gacor slot gacor slot dana deposit pulsa tanpa potongan slot thailand slot pulsa https://ppsdml.bpsdm.dephub.go.id/rames/toto/ https://kejari-sanggau.kejaksaan.go.id/ramestoto/ http://conference.fkm.unand.ac.id/rames/toto/ slot thailand togel online slot gacor slot gacor deposit pulsa tanpa potongan deposit pulsa tanpa potongan slot thailand slot gacor slot thailand deposit pulsa tanpa potongan

PERANCANGAN TATA LETAK GUDANG SPAREPART DENGAN MENGGUNAKAN METODE CLASS BASED STORAGE

  • nico williantoni Universitas Bina Darma
  • HASMAWATY HASMAWATY Universitas Bina Darma
Keywords: Class based storage, material handling, warehouse layout design

Abstract

PT Wana Potensi Guna is a company engaged in the production of palm oil processing. In carrying out palm oil production activities there are often constraints on its production machines, it is necessary to have a storage warehouse that is used to store equipment and spare parts to help the activities of palm oil production. This storage warehouse is located in nganti village, sanga village, musi banyuasin district, South Sumatra Province. PT Wana Potensi Guna has a warehouse with an area of spare parts warehouse area is 300 M2 which serves to support the production process. Class based storage method is done by placing materials based on the similarity of a type of material or material into a group. This group will be placed at a special location in the warehouse. Based on the results of the research warehouse layout can optimize the cost of material handling per month in the amount of Rp 3,099,500 from the initial layout of Rp 8,349,000.

 

Author Biographies

nico williantoni, Universitas Bina Darma

TEKNIK INDUSTRI

HASMAWATY HASMAWATY, Universitas Bina Darma

TEKNIK INDUSTRI

Published
2021-10-19