Abstract : This research was carried out at PT Pupuk Sriwidjaja Palembang where in the packing section
the workforce was not optimal. This study aims to calculate the standard time for bagging workers and
determine the amount of labor in the bagging section of NPK fertilizer. The method used in this study
calculates operator workload using standard time. Based on the data uniformity test, it is found that all data
is within the control limit. Calculation of workload is obtained from working hours at PT Pupuk Sriwidjaja
for eight hours of work with one and a half hours to rest, so the total working time is 390 minutes. The
results of the workload calculation obtained that for work stations 4 and 5 it is necessary to add additional
workforce as much as one person each.