Whatsapp Resmi Dewa16 SLOT THAILAND https://dewa16.co.uk/ https://bola16.co.uk/ slo16 slot gacor http://siad.dpmd.gorutkab.go.id/ https://journal.binadarma.ac.id/pages/article/deposit-pulsa-tanpa-potongan/ https://stennisflagflyers.com/ https://nanotechinstitute.org/ slot gacor https://hollyvalance.net/ slot gacor deposit pulsa tanpa potongan slot thailand deposit pulsa tanpa potongan slot gacor hari ini slot pulsa slot pulsa https://dewa16.id/ slot gacor slot16 BOLA16 BOLA16 SLOT16 slot gacor deposit pulsa tanpa potongan https://sertifikasi.upy.ac.id/assets/mgacor/ http://103.141.105.92/ slot gacor slot gacor slot gacor slot dana slot gacor slot gacor slot thailand slot pulsa slot kamboja slot gacor https://sibangkodir.bpsdm.jatimprov.go.id/api/gacor deposit pulsa tanpa potongan slot kamboja https://littlebeedesigns.co.uk/ slot gacor maxwinhttps://siakad.stikeslakipadada.ac.id/sgacor/ https://stikeslakipadada.ac.id/gacor slot gacor slot dana deposit pulsa tanpa potongan slot thailand slot pulsa https://ppsdml.bpsdm.dephub.go.id/rames/toto/ https://kejari-sanggau.kejaksaan.go.id/ramestoto/ http://conference.fkm.unand.ac.id/rames/toto/ slot thailand togel online slot gacor slot gacor deposit pulsa tanpa potongan deposit pulsa tanpa potongan slot thailand slot gacor slot thailand deposit pulsa tanpa potongan

ANALISIS TATA LETAK FASILITAS PRODUKSI MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING

  • Rahmat Basuki Universitas Bina Darma
  • M.Kumroni Makmuri Universitas Bina Darma
  • Amiluddin Zahri Universitas Bina Darma
Keywords: Crude palm oil, Kernel, Systematic layout planning

Abstract

Facility layout is an important step in supporting the smooth work process. This study tries to analyze the layout of production facilities, as a result of the replacement of diesel engines to electric motors. Without using basic methods and studies before changes are made, problems arise in the production process. That is happening on the inclined e.bunch engine and the supply of fuel to the boiler (fuel distributor conveyor) often breaks down, the impact of the problem makes the production process performance not optimal. The purpose of the research is to calculate the space requirements based on production facilities, get a design layout layout of facilities, especially in production facilities and calculate the difference in area requirements for the production process.5.555,82 m2 , better layout design of production facilities based on the SLP method. And the difference between the area of the current production process and the needs of the area of the proposed production process, based on the method of systematic layout planning (SLP) there was a shortfall of 1,851.98m2

Published
2020-10-13