Whatsapp Resmi Dewa16 SLOT THAILAND https://dewa16.co.uk/ https://bola16.co.uk/ slo16 slot gacor http://siad.dpmd.gorutkab.go.id/ https://journal.binadarma.ac.id/pages/article/deposit-pulsa-tanpa-potongan/ https://stennisflagflyers.com/ https://nanotechinstitute.org/ slot gacor https://hollyvalance.net/ slot gacor deposit pulsa tanpa potongan slot thailand deposit pulsa tanpa potongan slot gacor hari ini slot pulsa slot pulsa https://dewa16.id/ slot gacor slot16 BOLA16 BOLA16 SLOT16 slot gacor deposit pulsa tanpa potongan https://sertifikasi.upy.ac.id/assets/mgacor/ http://103.141.105.92/ slot gacor slot gacor slot gacor slot dana slot gacor slot gacor slot thailand slot pulsa slot kamboja slot gacor https://sibangkodir.bpsdm.jatimprov.go.id/api/gacor deposit pulsa tanpa potongan slot kamboja https://littlebeedesigns.co.uk/ slot gacor maxwinhttps://siakad.stikeslakipadada.ac.id/sgacor/ https://stikeslakipadada.ac.id/gacor slot gacor slot dana deposit pulsa tanpa potongan slot thailand slot pulsa https://ppsdml.bpsdm.dephub.go.id/rames/toto/ https://kejari-sanggau.kejaksaan.go.id/ramestoto/ http://conference.fkm.unand.ac.id/rames/toto/ slot thailand togel online slot gacor slot gacor deposit pulsa tanpa potongan deposit pulsa tanpa potongan slot thailand slot gacor slot thailand deposit pulsa tanpa potongan

PELAKSANAAN TOTAL PRODUCTIVE MAINTENANCE TERHADAP KINERJA BUCKET WHEEL EXCAVATOR MELALUI CAUSE EFFECT DIAGRAM (Studi Kasus pada PT Bukit Asam, Tbk)

  • Abdi Ramandha Universitas Bina Darma
  • Desi Kusmindari Universitas Bina Darma
  • Septa Hardini Universitas Bina Darma
Keywords: Bucket wheel excavator, cause and effect diagram, and total productive Maintenance

Abstract

Bucket Wheel Excavators (BWE) are heavy equipment that are used to dredge coal alternately. This system is effective if all the engine units used in the mining process operate properly and optimally according to the design and capacity of the equipment. One method used to reduce these constraints is the Total Productive Maintenance (TPM) system through analysis of cause and effect diagrams. The comparison of OEE data between 2008 and 2018 was 41.97% and 36.34% for 2018. After the implementation of the TPM there was a decrease in OEE value of 5.63%. The decrease in OEE value is caused by damage that often occurs so that there are obstacles in the reliability level of the unit due to oversized dumping truck material so that it enters the conveyor line during excavation. tools and outside of the above which are the main causes are changes in production targets.

Published
2020-10-13