Whatsapp Resmi Dewa16 SLOT THAILAND https://dewa16.co.uk/ https://bola16.co.uk/ slo16 slot gacor http://siad.dpmd.gorutkab.go.id/ https://journal.binadarma.ac.id/pages/article/deposit-pulsa-tanpa-potongan/ https://stennisflagflyers.com/ https://nanotechinstitute.org/ slot gacor https://hollyvalance.net/ slot gacor deposit pulsa tanpa potongan slot thailand deposit pulsa tanpa potongan slot gacor hari ini slot pulsa slot pulsa https://dewa16.id/ slot gacor slot16 BOLA16 BOLA16 SLOT16 slot gacor deposit pulsa tanpa potongan https://sertifikasi.upy.ac.id/assets/mgacor/ http://103.141.105.92/ slot gacor slot gacor slot gacor slot dana slot gacor slot gacor slot thailand slot pulsa slot kamboja slot gacor https://sibangkodir.bpsdm.jatimprov.go.id/api/gacor deposit pulsa tanpa potongan slot kamboja https://littlebeedesigns.co.uk/ slot gacor maxwinhttps://siakad.stikeslakipadada.ac.id/sgacor/ https://stikeslakipadada.ac.id/gacor slot gacor slot dana deposit pulsa tanpa potongan slot thailand slot pulsa https://ppsdml.bpsdm.dephub.go.id/rames/toto/ https://kejari-sanggau.kejaksaan.go.id/ramestoto/ http://conference.fkm.unand.ac.id/rames/toto/ slot thailand togel online slot gacor slot gacor deposit pulsa tanpa potongan deposit pulsa tanpa potongan slot thailand slot gacor slot thailand deposit pulsa tanpa potongan

Pengaruh U-Turn Terhadap Kinerja Ruas Jalan (Kasus: U-Turn di Jalan Jendral Ahmad Yani, Palembang)

  • Riki Afriko Universitas Bina Darma
  • Mudiono Kasmuri Universitas Bina Darma
  • Nurly Gofar Universitas Bina Darma
Keywords: Road capacity, U-turn, Traffic jam

Abstract

Jalan Jendral Ahmad Yani is one of the main roads in Palembang. The road segment serves urban centers, offices and schools, therefore the transportation along this segment is susceptible to traffic jam and obstacles which causes delays. The condition is aggravated by the presence of U-turn which causes the delay of the moving vehicles along the road segment. Survey was conducted in this study to evaluate the effect of the U-Turn on traffic volume along the road segment. The survey was conducted for one week (7 days) from Monday to Sunday for 12 hours from 06:00 to 18:00 every day. In this case, traffic delay caused by U-turn (in front of Nagaswida) was analysed and evaluated based LHR (average daily traffic) and traffic delay. The road performance was analysed using 2014 Indonesian Road Capacity Guideline (PKJI) method. This study shows that the presence of U-turn increased the travel time by 13 seconds due to queuing and slow-moving during turning.

Published
2020-10-13