Whatsapp Resmi Dewa16 SLOT THAILAND https://dewa16.co.uk/ https://bola16.co.uk/ slo16 slot gacor http://siad.dpmd.gorutkab.go.id/ https://journal.binadarma.ac.id/pages/article/deposit-pulsa-tanpa-potongan/ https://stennisflagflyers.com/ https://nanotechinstitute.org/ slot gacor https://hollyvalance.net/ slot gacor deposit pulsa tanpa potongan slot thailand deposit pulsa tanpa potongan slot gacor hari ini slot pulsa slot pulsa https://dewa16.id/ slot gacor slot16 BOLA16 BOLA16 SLOT16 slot gacor deposit pulsa tanpa potongan https://sertifikasi.upy.ac.id/assets/mgacor/ http://103.141.105.92/ slot gacor slot gacor slot gacor slot dana slot gacor slot gacor slot thailand slot pulsa slot kamboja slot gacor https://sibangkodir.bpsdm.jatimprov.go.id/api/gacor deposit pulsa tanpa potongan slot kamboja https://littlebeedesigns.co.uk/ slot gacor maxwinhttps://siakad.stikeslakipadada.ac.id/sgacor/ https://stikeslakipadada.ac.id/gacor slot gacor slot dana deposit pulsa tanpa potongan slot thailand slot pulsa https://ppsdml.bpsdm.dephub.go.id/rames/toto/ https://kejari-sanggau.kejaksaan.go.id/ramestoto/ http://conference.fkm.unand.ac.id/rames/toto/ slot thailand togel online slot gacor slot gacor deposit pulsa tanpa potongan deposit pulsa tanpa potongan slot thailand slot gacor slot thailand deposit pulsa tanpa potongan

PERENCANAAN PEMELIHARAAN INSTRUMENTASI BERDASARKAN FAILURE MODE AND EFFECT ANALYSIS DAN MEAN TIME TO FAILURE

  • Hari Fadhil Universitas Bina Darma
  • Septa Hardinir Universitas Bina Darma
Keywords: corrective maintenance, failure mode and analysis effect, mean time to failure, preventive maintenance, risk priority number.

Abstract

[Planning maintenance of instrument base on FMEA and MTTF] In April 2019 Urea Plant PT Pupuk Sriwidjaja had been shutdown plant for 3 times because instrument component fail worked. For prevent that’s and for keep production of urea stable PT Pupuk Sriwidjaja Palembang implement factory maintenance management. Planner make schedule maintenance and manage material for maintenance will be available when needed. Make schedule preventive maintenance job we can see machine condition base on FMEA. And than we will get RPN value for planning corrective maintenance. RPN obtained calculate rating of severity, occurance and detection. Scale of rating is from 1 until 10 base on rule have been made. Instrument have the biggest value RPN will be analisis for get MTTF value. Instruments have biggest RPN value that is PCV-101. PCV-101 have 46,7 days of RPN value.

Published
2020-10-12