Whatsapp Resmi Dewa16 SLOT THAILAND https://dewa16.co.uk/ https://bola16.co.uk/ slo16 slot gacor http://siad.dpmd.gorutkab.go.id/ https://journal.binadarma.ac.id/pages/article/deposit-pulsa-tanpa-potongan/ https://stennisflagflyers.com/ https://nanotechinstitute.org/ slot gacor https://hollyvalance.net/ slot gacor deposit pulsa tanpa potongan slot thailand deposit pulsa tanpa potongan slot gacor hari ini slot pulsa slot pulsa https://dewa16.id/ slot gacor slot16 BOLA16 BOLA16 SLOT16 slot gacor deposit pulsa tanpa potongan https://sertifikasi.upy.ac.id/assets/mgacor/ http://103.141.105.92/ slot gacor slot gacor slot gacor slot dana slot gacor slot gacor slot thailand slot pulsa slot kamboja slot gacor https://sibangkodir.bpsdm.jatimprov.go.id/api/gacor deposit pulsa tanpa potongan slot kamboja https://littlebeedesigns.co.uk/ slot gacor maxwinhttps://siakad.stikeslakipadada.ac.id/sgacor/ https://stikeslakipadada.ac.id/gacor slot gacor slot dana deposit pulsa tanpa potongan slot thailand slot pulsa https://ppsdml.bpsdm.dephub.go.id/rames/toto/ https://kejari-sanggau.kejaksaan.go.id/ramestoto/ http://conference.fkm.unand.ac.id/rames/toto/ slot thailand togel online slot gacor slot gacor deposit pulsa tanpa potongan deposit pulsa tanpa potongan slot thailand slot gacor slot thailand deposit pulsa tanpa potongan

IMPLEMENTASI BASIS DATA TERPUSAT UNTUK PENAGIHAN TUNGGAKAN LISTRIK PADA CV. CAHAYA ABADI

  • Eka Septiawati Universitas Bina Darma Palembang
  • Siti Sauda Universitas Bina Darma
Keywords: Basis Data Terpusat, Penagihan Tunggakan Listrik, Basis Data Terpusat Untuk Penagihan Tunggakan Listrik

Abstract

Each company certainly cannot be separated from technology, which is technology that is expected to assist in doing every job, for example in a centralized database where the data can be accessed simultaneously. CV. Cahaya Abadi is a company or construction engaged in the electricity sector to carry out the problem of billing customer electricity arrears in villages in Sekayu District. Electricity Bill arrears in PT. Muba Electric Power is still a very big problem, namely the total bill reachesRp. 30,911,833,490 for 10 Districts consisting of 20,677 subscribers. Due to the mismatch of the usage records recorded by the meter registering officer every month, the amount of the bill appeared and made customers lazy to pay.So, to overcome these problems, namely by creating a database that will be connected to the scope of the parts in the CV. Eternal Light centrally. So that every job gets the desired results with structured performance. The database development method used for this study uses the methodLife Cycle Database(DBLC).

 

Keywords : Centralized Database, Electricity Arrears Billing, Life Cycle Database (DBLC).

Published
2021-06-08